Skip to content
What We Do
Climate Corps Projects

Covestro – Jingxin Ding – 2021

Goals

The goal of this project is to develop a utility KPI system with functions of online monitoring, real-time forecasting feedback, and automatic self-upgrading to enhance the operating efficiency, reduce the energy consumption by online monitoring, and make optimal parameter recommendations.

Solutions

The utility KPI system aims to recommend operating parameters by analysis of the parameters that affect the energy consumption of the system and optimize the algorithm to achieve the minimum system energy consumption while taking into account environmental factors and related operating factors in order to maximize the energy efficiency of the system. The fellowship focused on four systems: Cooling Water System, Instrument Air System, Chilled System, and the Ammonia Refrigeration System.

Potential Impact

Covestro continues to make efforts to achieve carbon neutrality and the ultimate circular economy and the KPI project is one of the typical projects to improve energy efficiency. It is hoped that during the implementation phase of the current project, production can flexibly adjust system parameters in time according to system operation instructions, actively practice energy conservation and emission reduction, and inject new momentum into the promotion of low energy consumption and high energy efficiency.

At a glance
Industry: Industrial Goods and Manufacturing
Project types:
  • Data Analysis
  • Industrial Energy Efficiency
Year: 2021
Location: Shanghai, China
About the fellow
Jingxin Ding
Shanghai Jiaotong University

Who We Work With

EDF has collaborated with over 40% of Fortune 100 companies to align sustainability goals with bottom line gains